简要综述了混凝土重力坝的溃坝问题,推导并分析了重力坝合理断面理论公式,简述了胶凝砂砾石坝采用等腰三角型断面、日本重力坝断面偏大以及上游采用折坡设计等原因,分析比较了200 m以上特高重力坝国内外设计的断面差别。基于分析,指出我国重力坝需基于观测进一步深化大坝抗滑稳定研究,对于200 m以上高坝,则需进一步深化设计准则的探讨。
Abstract:The problems from failures of concrete gravity dam are briefly reviewed herein,and then the theoretical formula for the reasonable cross-section of gravity dam is derived and analyzed. Furthermore,the reasons why the isosceles triangular cross-section is adopted for the cement-sand-gravel dam and why the cross-secion of gravity dam in japan is a little bit too larger and its upstream is designed with a fold-slope are illustrated,while the differences among the cross-sections designed for the super-high gravity dams with the heights over 200 m at home and abroad are comparatively analyzed. Based on the relevant analysis,it is pointed out that not only the study on the dam stability against sliding is necessary to be deepened in China,but the relevant design criteria for the high dams with the heights over 200 m are also necessary to be deepened.
[1]张楚汉,王光纶,金峰.水工建筑学[M].北京:清华大学出版社,2011.
[2]SL 319—2005,混凝土重力坝设计规范[S].
[3]沈长松,等.水工建筑物[M].北京:中国水利水电出版社,2008.
[4]贾金生,马锋玲,等,胶凝砂砾石坝材料特性研究及工程应用[J].水利学报,2006,37(5):578-582.
[5]日本大坝委员会.坝工设计规范[S].北京:水利出版社,1981.
[6]张国新,刘毅.坝基稳定分析的有限元直接反力法[J].水力发电,2006,32(12):30-38.
[7]贾金生,李新宇,郑璀莹.特高重力坝考虑高压水劈裂影响的初步研究[J].水利学报,2006,37(12):1509-1515.
[8]DANIEL F.MARTT,ABDUL SHAKOOR,BRIAN H.GREENE,Austin Dam,Pennsylvania:The Sliding Failure of a Concrete Gravity Dam[J].Environmental&Engineering Geoscience,February2005,Ⅺ(1):61-72.
[9]刘正启.日本的坝工技术发展史[J].水利水电快报,1994(14).
[10]漆富冬.日本坝工地质及基础处理[J].水力发电,1982(4)
基本信息:
DOI:10.13928/j.cnki.wrahe.2013.07.016
中图分类号:TV642.3
引用信息:
[1]李晶,贾金生,汪洋,等.关于混凝土重力坝断面设计的探讨[J].水利水电技术,2013,44(07):34-38.DOI:10.13928/j.cnki.wrahe.2013.07.016.