| 1,636 | 68 | 262 |
| 下载次数 | 被引频次 | 阅读次数 |
土石坝溃坝机理与溃坝数学模型研究对于预测溃坝洪水致灾过程和致灾后果具有重要的意义。为此,概要介绍了国内外在土石坝溃决机理与溃坝过程数学模型方面的研究进展,特别是笔者研究团队近年来在该领域的最新研究成果,表明以笔者研究团队为代表的国内专家学者,在高土石坝溃坝离心模型试验技术,高心墙坝、面板坝及堰塞坝溃决机理和溃坝过程模拟理论研究方面走在了世界前列。但在土石坝溃坝过程模拟计算机软件的通用性以及溃坝致灾过程的可视化技术方面与欧美国家相比,仍有相当大的差距。建议今后应加大精细模拟高心墙坝、高面板坝溃坝过程数学模型的研究力度,注重可视化技术在溃坝过程模拟中的应用,加快研制通用性友好,能精细模拟土石坝溃坝及其致灾过程的可视化计算机软件。
Abstract:The studies on the failure mechanism and numerical dam failure model of earth-rockfill dam have important significance for predicting the process of dam failure-caused flood disaster and the disaster-causing consequence. Therefore, the study progresses in the aspects of dam failure mechanism and numerical dam failure model of earth-rockfill dam at home and abroad are briefly introduced herein, especially the latest study achievements obtained by the author's study group in recent years, which indicate that the experts and scholars represented by the author's study group walk in the forefront of the world in the aspects of the technique of centrifugal model test for failure of high earth-rockfill dam, the dam failure mechanisms and dam failure process simulating theory of high dam with core-wall, concrete face rockfill dam as well as landslide dam. However, if compared with the countries in Europe and America, considerable gaps are still there in the aspects of the universality of the computer software for simulating the failure process of earth-rockfill dam and the visualization technique of dam failure-caused disaster process. It is suggested that more efforts are necessary to be made in the aspects of the study on the numerical model for finely simulating the dam failure processes of high dam with core-wall and concrete face rockfill dam in the days to come, while more attention are paid to the application of visualization technique to the simulation of dam failure process. Meanwhile, the study and development of the computer visualization software with universal friendliness for finely simulating the dam failure and the failure-caused disaster processes are necessary to be sped up as well.
[1] 中华人民共和国水利部,中华人民共和国国家统计局.第一次全国水利普查公报[M].北京:中国水利水电出版社,2013.
[2] 中华人民共和国水利部.2017年全国水利发展统计公报[M].北京:中国水利水电出版社,2018.
[3] 张建云,杨正华,蒋金平.我国水库大坝病险及溃决规律分析[J].中国科学:技术科学,2017,47(12):1313- 1320.
[4] 水利部大坝安全管理中心.全国水库垮坝登记册[R].南京:水利部大坝安全管理中心,2019.
[5] 汝乃华,牛运光.大坝事故与安全·土石坝[M].北京:中国水利水电出版社,2001.
[6] 刘宁,杨启贵,陈祖煜.堰塞湖风险处置[M].武汉:长江出版社,2016.
[7] 廖鸿志.2018年10月“两江”堰塞湖应急处置工作回顾[J].中国防汛抗旱,2018,28(12):4- 6.
[8] 石振明,马小龙,彭铭,等.基于大型数据库的堰塞坝特征统计分析与溃决参数快速评估模型[J].岩石力学与工程学报,2014,33(9):1780- 1790.
[9] 王立辉,胡四一.溃坝问题研究综述[J].水利水电科技进展,2007,27(1):80- 85.
[10] 陈生水.土石坝溃决机理与溃决过程模拟[M].北京:中国水利水电出版社,2012.
[11] 陈生水,徐光明,钟启明,等.土石坝溃坝离心模型试验系统研制及应用[J].水利学报,2012,43(2):241- 245.
[12] 陈生水,徐光明,顾行文,等.土石坝溃坝离心模型试验中水流控制与测量[J].水利学报,2018,49(8):901- 906.
[13] ASCE/EWRI Task Committee on Dam/Levee Breaching.Earthen embankment breaching[J].Journal of Hydraulic Engineering,2011,137(12):1549- 1564.
[14] 朱勇辉,VISSER P J,VRIJLING J K,等.堤坝溃决试验研究[J].中国科学:技术科学,2011,41(2):150- 157.
[15] ORENDORFF B,ALRIFFAI M,NISTOR I,et al.Breach outflow characteristics of non-cohesive embankment dam subject to blast[J].Canadian Journal of Civil Engineering,2013,40(3):243- 253.
[16] KAKINUMA T,SHIMIZU Y.Large-scale experiment and numerical modeling of a riverine levee breach[J].Journal of Hydraulic Engineering,2014,140(9):04014039.
[17] SCHMOCKER L,FRANK P J,HAGER W H.Overtopping dike-breach:effect of grain size distribution[J].Journal of Hydraulic Research,2014,52(4):559- 564.
[18] TABRIZI A A,ELAFLY E,ELKHOLY M,et al.Effect of compaction on embankment breach due to overtopping[J].Journal of Hydraulic Research,2017,55(2):236- 247.
[19] MORRIS M W,HASSAN M A A M,VASKINN K A.Breach formation:Field test and laboratory experiments[J].Journal of Hydraulic Research,2007,45(S1):9- 17.
[20] HANSON G J,COOK K R,HUNT S L.Physical modeling of overtopping erosion and breach formation of cohesive embankments[J].Transactions of ASAE,2005,48(5):1783- 1794.
[21] ZHANG J Y,LI Y,XUAN G X,et al.Overtopping breaching of cohesive homogeneous earth dam with different cohesive strength[J].Science China:Technological Sciences,2009,52(10):3024- 3029.
[22] 陈生水,钟启明,曹伟.黏土心墙坝漫顶溃决过程离心模型试验与数值模拟[J].水科学进展,2011,22(5):87- 92.
[23] 国家防汛抗旱总指挥部办公室,水利部科学技术司.沟后水库砂砾石面板坝:设计、施工、运行与失事[M].北京:中国水利水电出版社,1996.
[24] 李君纯.沟后面板坝溃决的研究[J].水利水运科学研究,1995(4):425- 434.
[25] 张婧,曹叔尤,杨奉广,等.堰塞坝泄流冲刷试验研究[J].四川大学学报(工程科学版),2010,42(5):191- 196.
[26] NIU Z P,XU W L,LI N W,et al.Experimental investigation of the failure of cascade landslide dams[J].Journal of Hydrodynamics,2012,24(3):430- 441.
[27] 蒋先刚,崔鹏,王兆印,等.堰塞坝溃口下切过程试验研究[J].四川大学学报(工程科学版),2016,48(4):38- 44.
[28] ZHOU G G D,ZHOU M J,SHRESTHA M S,et al.Experimental investigation on the longitudinal evolution of landslide dam breaching and outburst floods.Geomorphology,2019,(334):29- 43.
[29] LIU N,CHEN Z Y,ZHANG J X,et al.Draining the Tangjiashan barrier lake[J].Journal of Hydraulic Engineering,2010,136(11):914- 923.
[30] 赵天龙,陈生水,王俊杰,等.堰塞坝漫顶溃坝离心模型试验研究[J].岩土工程学报,2016,38(11):1965- 1972.
[31] FOSTER M,FELL R,SPANNAGLE M.The statistics of embankment dam failures and accidents[J].Canadian Geotechnical Journal,2000,37(5):1000- 1024.
[32] FELL R,WAN C F,CYGANIEWICZ J,et al.Time for development of internal erosion and piping in embankment dams[J].Journal of Geotechnical and Geoenvironmental Engineering,2003,129(4):307- 314.
[33] RICHARDS K S,REDDY K R.Critical appraisal of piping phenomena in earth dams[J].Bulletin of Engineering Geology and the Environment,2007,66(4):381- 402.
[34] 盛金保,刘嘉炘,张士辰,等.病险水库除险加固项目溃坝机理调查分析[J].岩土工程学报,2008,30(11):1620- 1625.
[35] MORRIS M W,GALLAND J C.CADAM:Dambreak modelling guidelines & best practice[R].Munich:HR Wallingford Ltd.,1998.
[36] HANSON G J,TEJRAL R D,HUNT S L,et al.Internal erosion and impact of erosion resistance[C]// Proc.of the United States Society on Dams,30th Annual USSD Conf.,Sacramento,2010.
[37] SHARIF Y A,ELKHOLY M,CHAUDHRY M H,et al.Experimental study on the piping erosion process in earthen embankments[J].Journal of Hydraulic Engineering,2015,141(7):04025012.
[38] KIRKPATRICK G W.Evaluation guidelines for spillway adequacy[C]// The Evaluation of Dam Safety,Engineering Foundation Conf.,New York,1977.
[39] Soil Conservation Service (SCS).Simplified dam-breach routing procedure[R].Washington DC:US Dept.of Agriculture,1981.
[40] HAGEN V K.Re-evaluation of design floods and dam safety[C]// Proc.14th Congress of Int.Comm.on Large Dams,Paris,1982.
[41] SINGH K P,SNORRASON A.Sensitivity of outflow peaks and flood stages to the selection of dam breach parameters and simulation models[J].Journal of Hydrology,1984(68):295- 310.
[42] MACDONALD T C,LANGRIDGE-MONOPOLIS J.Breaching characteristics of dam failure[J].Journal of Hydraulic Engineering,1984,110(5):567- 586.
[43] COSTA J E.Floods from dam failures[R].Denver:Open-File Rep.No.85- 560,USGS,1985.
[44] EVANS S G.The maximum discharge of outburst floods caused by the breaching of man-made and natural dams[J].Canadian Geotechnical Journal,1986,23(3):385- 387.
[45] U.S.Bureau of Reclamation (USBR).Downstream hazard classification guidelines[R].Denver:ACER Tech.Memorandum No.11,U.S.Department of the Interior,1988.
[46] FROEHLICH D C.Peak outflow from breached embankment dam[J].Journal of Water Resources Planning and Management,1995,121(1):90- 97.
[47] WALDER J S,O’Connor J E.Methods for predicting peak discharge of floods caused by failure of natural and constructed earthen dams[J].Water Resources Research,1997,33(10):2337- 2348.
[48] XU Y,ZHANG L M.Breaching parameters for earth and rockfill dams[J].Journal of Geotechnical and Geoenvironmental Engineering,2009,135(12):1957- 1969.
[49] PIERCE M W,THORNTON C I,ABT S R.Predicting peak outflow from breached embankment dams[J].Journal of Hydrologic Engineering,2010,15(5):338- 349.
[50] THORNTON C I,PIERCE M W,ABT S R.Enhanced predictions for peak outflow from breached embankment dams[J].Journal of Hydrologic Engineering,2011,16(1):81- 88.
[51] DE LORENZO G,MACCHIONE F.Formulas for the peak discharge from breached earthfill dams[J].Journal of Hydraulic Engineering,2014,140(1):56- 67.
[52] HOOSHYARIPOR F,TAHERSHAMSI A,GOLIAN S.Application of copula method and neural networks for predicting peak outflow from breached embankments[J].Journal of Hydro-environment Research,2014,8(3):292- 303.
[53] AZIMI R,VATANKHAH A R,KOUCHAKZADEH S.Predicting peak discharge from breached embankment dams[C]// E-Proc.36th IAHR World Congress,Hague,2015.
[54] FROEHLICH D C.Predicting peak discharge from gradually breached embankment dam[J].Journal of Hydrologic Engineering,2016,21(11):04016041.
[55] 梅世昂,陈生水,钟启明,等.土石坝溃坝参数模型研究[J].工程科学与技术,2018,50(2):60- 66.
[56] VON THUN J L,GILLETTE D R.Guidance on breach parameters[R].Denver:Internal Memorandum,Bureau of Reclamation,U.S.Dept.of the Interior,1990.
[57] FROEHLICH D C.Embankment dam breach parameters revisited[C]// Proc.1995 Conf.On Water Resources Engineering,New York,1995.
[58] CRISTOFANO E A.Method of computing erosion rate for failure of earthfill dams[R].Denver:US Bureau of Reclamation,1965.
[59] ZHONG Q M,WU W M,Chen S S,et al.Comparison of simplified physically based dam breach models[J].Natural Hazards,2016,84(2):1385- 1418.
[60] FREAD D L.BREACH:An erosion model for earthen dam failure[R].Silver Spring:National Weather Service,National Oceanic and Atmospheric Administration,1988.
[61] BROWN R J,ROGERS D C.BRDAM users’ manual[R].Denver:U.S.Department of the Interior,1981.
[62] FREAD D L.DAMBREAK:The NWS dam break flood forecasting model[R].Silver Spring:National Weather Service (NWS) Rep.,National Oceanic and Atmospheric Administration (NOAA),1984.
[63] SINGH V P,SCARLATOS C A.Breach erosion of earthfill dams and flood routing:BEED model[R].Research Triangle Park:Res.Rep.,Army Research Office,Battelle,1985.
[64] MOHAMED A A A,SAMUELS P G,MORRIS M W,et al.Improving the accuracy of prediction of breach formation through embankment dams and flood embankments[C]// Proc.Int.Conf.on Fluvial Hydraulics (River Flow 2002),Louvain-la-Neuve,Belgium,2002.
[65] MORRIS M W,KORTENHAUS A,VISSER P J.Modelling breach initiation and growth[R].FLOODsite Report T06- 08- 02,FLOODsite Consortium,2009.
[66] WANG P,KAHAWITA R,MOKHTARI A,et al.Modeling breach formation in embankments due to overtopping[C]// ICOLD Conference,Barcelona,Spain,2006.
[67] TEMPLE D M,HANSON G J,NEILSEN M L,et al.Simplified breach analysis model for homogeneous embankment:Part I,Background and model components[C]// Proc.25th Annual USSD Conference,U.S.Society on Dams,Denver,2005.
[68] TEMPLE D M,HANSON G J,NEILSEN M L.WINDAM-Analysis of overtopped earth embankment dams[C]// Proc.,ASABE Annual Int.Meeting,American Society of Agricultural and Biological Engineers,St.Joseph,2006.
[69] HANSON G J,TEJRAL R D,HUNT S L,et al.Internal erosion and impact of erosion resistance[C]// Proc.,30th U.S.Society on Dams Annual Meeting and Conference (CD-ROM),USSD,Sacramento,2010.
[70] CHANG D S,ZHANG L M.Simulation of the erosion process of landslide dams due to overtopping considering variations in soil erodibility along depth[J].Natural Hazards and Earth System Sciences,2010,10(4):933- 946.
[71] WU W M.Simplified physically based model of earthen embankment breaching[J].Journal of Hydraulic Engineering,2013,139(8):837- 851.
[72] CHEN Z Y,MA L Q,YU S,et al.Back analysis of the draining process of the Tangjiashan barrier lake[J].Journal of Hydraulic Engineering,2015,141(4):05014011.
[73] WANG L,CHEN Z Y,WANG N X,et al.Modeling lateral enlargement in dam breaches using slope stability analysis based on circular slip mode[J].Engineering Geology,2016(209):70- 81.
[74] CHEN Z Y,PING Z Y,WANG N X,et al.An approach to quick and easy evaluation of the dam breach flood[J].Science China:Technological Sciences,2019,62,https://doi.org/10.1007/s11431- 018- 9367- 4.
[75] CHEN S S,ZHONG Q M,CAO W.Breach mechanism and numerical simulation for seepage failure of earth-rock dams[J].Science China:Technological Sciences,2012,55(6):1757- 1764.
[76] ZHONG Q M,CHEN S S,Deng Z.A simplified physically-based model for core dam overtopping breach[J].Engineering Failure Analysis,2018(90):141- 155.
[77] ZHONG Q M,CHEN S S,Mei S A,et al.Numerical simulation of landslide dam breaching due to overtopping[J].Landslides,2018,16(6):1183- 1192.
[78] ZHONG Q M,CHEN S S,Fu Z Z.Failure of concrete face sand-gravel dam due to water flow overtops[J].ASCE’s Journal of Performance of Constructed Facilities,2019,33(2):04019007.
[79] ZHONG Q M,CHEN S S,DENG Z,et al.Prediction of overtopping-induced breach process of cohesive dams[J].ASCE’s Journal of Geotechnical and Geoenvironmental Engineering,2019,145(5):04019012.
[80] KESSERWANI G,SHAMKHALCHIAN A,ZADEH M J.Fully coupled discontinuous Galerkin modeling of dam-break flows over movable bed with sediment transport[J].Journal of Hydraulic Engineering,2014,140(4):06014006.
[81] WANG Z,BOWLES D S.Three-dimensional non-cohesive earthen dam breach model.Part 1:Theory and methodology[J].Advances in Water Resources,2006,29(10):1528- 1545.
[82] FAEH R.Numerical modeling of breach erosion of river embankments[J].Journal of Hydraulic Engineering,2007,133(9):1000- 1009.
[83] WU W M,WANG S S.One-dimensional modeling of dam-break flow over movable beds[J].Journal of Hydraulic Engineering,2007,133(1):48- 58.
[84] WU W M,MARSOOLI R,He Z G.Depth-averaged two-dimensional model of unsteady flow and sediment transport due to noncohesive embankment break/breaching[J].Journal of Hydraulic Engineering,2012,138(6):503- 516.
[85] SWARTENBROEKX C,SOARES-FRAZAO S,STAQUET R,et al.Two-dimensional operator for bank failures induced by water-level rise in dam-break flows[J].Journal of Hydraulic Research,2010,48(3):302- 314.
[86] LI S C,DUFFY C J.Fully coupled approach to modeling shallow water flow,sediment transport,and bed evolution in rivers[J].Water Resources Research,2011,47(3):1- 20.
[87] CAO Z X,YUE Z Y,PENDEr G.Landslide dam failure and flood hydraulics.Part II:coupled mathematical modelling[J].Natural Hazards,2011,59(2):1021- 1045.
[88] ROSATTI G,BEGNUDELLI L.A closure-independent generalized Roe solver for free-surface,two-phase flows over mobile bed[J].Journal of Computational Physics,2013(255):362- 383.
[89] ROSATTI G,BEGNUDELLI L.Two-dimensional simulation of debris flows over mobile bed:Enhancing the TRENT2D model by using a well-balanced generalized Roe-type solver[J].Computers and Fluids,2013(71):179- 195.
[90] JUEZ C,MURILLO J,GARCIA-NAVARRO P.Numerical assessment of bed-load discharge formulations for transient flow in 1D and 2D situations[J].Journal of Hydroinformatics,2013,15(4):1234- 1257.
[91] JUEZ C,MURILLO J,GARCIA-NAVARRO P.A 2D weakly-coupled and efficient numerical model for transient shallow flow and movable bed[J].Advances in Water Resources,2014(71):93- 109.
[92] SWARTENBROEKX C,ZECH Y,SOARES-FRAZAO S.Two-dimensional two-layer shallow water model for dam break flows with significant bed load transport[J].International Journal for Numerical Methods in Fluids,2013,73(5):477- 508.
[93] GUAN M,WRIGHT N G,SLEIGH P A.2D process-based morphodynamic model for flooding by noncohesive dyke breach[J].Journal of Hydraulic Engineering,2014,140(7):04014022.
[94] KESSERWANI G,SHAMKHALCHIAN A,ZADEH M J.Fully coupled discontinuous Galerkin modeling of dam-break flows over movable bed with sediment transport[J].Journal of Hydraulic Engineering,2014,140(4):06014006.
[95] RAZAVITOOSI S L,AYYOUBZADEH S A,VALIZADEH A.Two-phase SPH modelling of waves caused by dam break over a movable bed[J].International Journal of Sediment Research,2014,29(3):344- 356.
[96] MARSOOLI R,WU W M.Three-dimensional numerical modeling of dam-break flows with sediment transport over movable beds[J].Journal of Hydraulic Engineering,2015,141(1):04014066.
[97] ABDERREZZAK K E K,MORAN A D,TASSI P,et al.Modelling river bank erosion using a 2D depth-averaged numerical model of flow and non-cohesive,non-uniform sediment transport[J].Advances in Water Resources,2016(93):75- 88.
[98] CANTERO-CHINCHILLA F N,CASTRO-ORGAZ O,DEY S,et al.Nonhydrostatic dam break flows.II:One-dimensional depth-averaged modeling for movable bed flows[J].Journal of Hydraulic Engineering,2016,142(12):04016069.
[99] CRISTO C D,GRECO M,IERVOLINO M,et al.Two-dimensional two-phase depth-integrated model for transients over mobile bed[J].Journal of Hydraulic Engineering,2016,142(2):04015043.
[100] CRISTO C D,EVANGELISTA S,GRECO M,et al.Dam-break waves over an erodible embankment:experiments and simulations[J].Journal of Hydraulic Research,2018,56(2):196- 210.
[101] 阎志坤.尾矿库漫顶溃决离心模型试验技术及溃决过程模拟方法研究[D].南京:南京水利科学研究院,2019.
基本信息:
DOI:10.13928/j.cnki.wrahe.2019.08.004
中图分类号:TV122.4
引用信息:
[1]陈生水,陈祖煜,钟启明.土石坝和堰塞坝溃决机理与溃坝数学模型研究进展[J].水利水电技术,2019,50(08):27-36.DOI:10.13928/j.cnki.wrahe.2019.08.004.
基金信息:
国家重点研发计划项目(2017YFC0404800);; 国家自然科学基金项目(51539006,51779153)
2019-08-20
2019-08-20