| 175 | 17 | 47 |
| 下载次数 | 被引频次 | 阅读次数 |
三峡水电站机组蜗壳HD值高,其埋设方式对厂房和机组的安全稳定运行具有关键的影响。蜗壳直接埋入法相对于垫层埋入法和充水保压埋入法而言,其外围钢筋混凝土承担的内水压力较大,但施工比较简单且节省蜗壳钢材,因此三峡水电站15#机组拟采用直接埋入法。文中在已有静力研究成果的基础上,分析了局部混凝土开裂后的厂房结构的整体自振特性和振动响应,并根据计算结果和振动标准对厂房结构的振动做了安全评价。
Abstract:On account of the high value of HD for the spiral cases of turbine-generating units in Three Gorge Hydropower Plant,the embedding method for the case has a significant effect on safe and stable operation of both the powerhouse and the units.Compared with the embedment with cushion and the embedment with the method of water-filling and pressure-maintaining,a greater internal water pressure has to be born by its surrounding reinforced concrete,if the direct embedment is applied to the embedding of the spiral case of the unit,however,the construction can be simplified and the steel for the case can be saved to a certain extent with this method.Therefore,the direct embedment is planned to be applied to the spiral case for the 15th turbine-generating unit.Based on the existed analysis concerned,the self-oscillation characteristics of the integral powerhouse with local cracks on the concrete and its vibration response are analyzed herein,and then a safety assessment is made on the vibration of the powerhouse structure in accordance with the relevant calculation and vibration control standards.
[1]王时越,张立翔,等.混凝土疲劳刚度衰减规律试验研究[J].力学与实践,2003,25(5):55-57.
[2]马震岳,董毓新,等.三峡水电站厂房结构动力分析与优化[J].水电能源科学,2000,18(3):26-28.
[3]郭永刚,张祁汉.三峡水电站厂房结构自振特性研究[J].水力发电,2002,(1):13-15.
[4]陈婧,马震岳,等.三峡电站主厂房振动分析[J].水力发电学报,2004,23(5):36-39.
[5]马震岳,陈婧,等.三峡电站主厂房振动分析[J].三峡大学学报(自然科学版),2004,26(2):111-115.
[6]长江勘测规划设计研究院.长江三峡水利枢纽左岸电站水轮发电机组激振力分析研究[R].2002.
[7]顾鹏飞,喻光远.水电站厂房设计[M].北京:水利水电出版社,1987.
[8]徐建.建筑振动工程手册[M].北京:中国建筑工业出版社,2002.
[9]SL 266—2001.水电站厂房设计规范[S].
[10]中华人民共和国水利部.YBJ 55-90,YSJ 009-90机器动荷载作用下建筑物承重结构的振动计算和隔振设计规程[M].北京:冶金工业出版社,1990.
基本信息:
中图分类号:TV312
引用信息:
[1]欧阳金惠,陈厚群,张超然,等.156m水位下三峡水电站15~#机组厂房结构的振动安全研究[J].水利水电技术,2007,No.407(09):48-51.