2008, 04, No.414 79-82
琅琊山抽水蓄能电站地下厂房及水道系统充、蓄水过程中监测分析
基金项目(Foundation):
邮箱(Email):
DOI:
| 142 | 2 | 31 |
| 下载次数 | 被引频次 | 阅读次数 |
摘要:
重点分析了琅琊山抽水蓄能电站地下厂房及水道系统在充、蓄水过程中各监测部位观测值变化情况及围岩稳定情况,及时为电站安全运行提供了监测资料。
Abstract:The variation of the observation values from all the monitored locations and the stability of the surrounding rock of the underground powerhouse and water conduit during the water filling and storing process of Lanyashan Pumped Storage Hydropower Station are emphatically analyzed herein,which provides the relevant monitoring data for the safety operation of the station.
暂无数据
基本信息:
中图分类号:TV743
引用信息:
[1]黄小军,王炳芳,艾民.琅琊山抽水蓄能电站地下厂房及水道系统充、蓄水过程中监测分析[J].水利水电技术,2008,No.414(04):79-82.