锦屏二级水电站地下厂房岩锚梁施工
基金项目(Foundation):
邮箱(Email):
DOI:
发布时间:
2008-11-20
出版时间:
2008-11-20
| 140 | 5 | 33 |
| 下载次数 | 被引频次 | 阅读次数 |
摘要:
锦屏二级水电站地下厂房岩锚梁地质条件较差,岩锚梁开挖过程中采取了沿保护层深孔预裂、分区开挖,在斜台下部增加锁口锚杆、用高强树脂锚杆超前支护、超前灌浆等多项有效技术措施,岩壁梁施工取得了良好的效果。
Abstract:As the geological condition for the rock anchored beam of the underground powerhouse of Jinping-II Hydropower Station is poor,the effective construction measures such as deep hole pre-splitting and zoning excavation along the protected layer,adding locked anchor-bars at the lower part of the declined table,advanced supporting with high-strength resin anchor-bars,advanced grouting etc.are adopted therein,and then better construction effect is obtained as well.