极端暴雨洪水给流域防洪调度带来了巨大考验,依靠单个水库独挑蓄泄重任已不能满足防洪要求,亟需探讨在突发汛情时梯级坝工程的联合应急调度方案。为此,以优化理论为指导,以梯级坝泄流时间最短为目标函数,依据坝群的运行原则,设定各库区的水位、流量等约束条件,综合考虑橡胶坝的塌落时刻及塌落速度(时长),建立梯级坝联合调度优化模型。基于梯级橡胶坝工程实例,模拟计算出坝群在不同洪水频率(1%、2%、10%)下的优化调度方案。结果表明,多变量分析模型(塌落时刻与塌落速度均为决策变量)的设计方案要比单一变量(塌落速度一定)时至少提前10 min完成泄流;在满库的情况下,研究对象中1~#—6~#级坝体自下而上最快可在75 min内完成腾容迎汛任务,且P=1%的洪水安全调度时限(从调度开始时刻到洪峰抵达工程段上游时刻所隔的时间)严格控制在90 min以内,比常规控制法缩短了至少30 min非必要的时间损耗。梯级坝联合调度优化模型可结合具体洪水量级与工程参数,科学规划各级橡胶坝的塌落方式,加快泄洪进程。尤其是当暴雨中心临近工程段上游时,相应的汇流时间短,优化模型的设计方案能确保梯级水库在较短洪水预见期内安全泄流。
Abstract:Taking optimization theory as the guidance and the shortest discharging time of cascade dams as the objective function, the constraint conditions, i.e. water levels, flow rates, etc. of all the reservoir areas of the cascade rubber dams are set and the collapse moment and collapse speed(duration) are comprehensively considered in accordance with the operation principle of rubber dam group, and then a joint optimized operation model for cascade rubber dams is established. Based on an actual engineering case of cascade rubber dams, the optimized operation schemes under different flood frequencies(1%, 2%, 10%) for the rubber dam group are simulatively calculated. The results show that the completion of flood discharge from the design scheme of multivariable analysis model(with the decision variables of both the collapse moment and the collapse speed) is at least 10 min earlier than that of the single variable(a certain collapse speed). Under the full-reservoir condition, the dams of 1~6 stages from downstream to upstream in the study object can complete the task to empty the reservoirs for flood control within a fastest time of 75 min, while the safe time limit(the time interval between the beginning of the dispatching and the moment when the flood peak reaches the upstream section of the project) for flood dispatching at P=1% can be strictly controlled within 90 min, from which the unnecessary time loss is at least shortened by 30 min if compared with that from the relevant conventional control methods. The joint optimized operation model for cascade rubber dams can scientifically plan the collapse modes of the rubber dams of all the stages to speed up the flood discharge in combination with the specific flood amplitude and the relevant engineering parameters. Especially, when the rainstorm center closely approaches to the upstream section of the project with a shorter flow concentration time, the design scheme of the optimized model can surly ensure the safe flood discharge with a shorter flood prediction period.
[1] 周新春,许银山,冯宝飞.长江上游干流梯级水库群防洪库容互用性初探[J].水科学进展,2017,28(3):421- 428.ZHOU Xinchun,XU Yinshan,FENG Baofei.Preliminary study on flood control capacity int-eroperability of cascade reservoirs in the upper reaches of the Yangtze river [J].Advances in Water Science,2017,28(3):421- 428.
[2] 唐海华,罗斌,周超,等.水库群联合调度多模型集成总体技术架构[J].人民长江,2018,49(13):95- 98.TANG Haihua,LUO Bin,ZHOU Chao,et al.Multi-model integrated overall technical framework for reservoir group joint operation [J].Renmin Yangtze River,2008,49(13):95- 98.
[3] 刁艳芳,段震,张荣,等.梯级水库群联合防洪预报调度方式风险分析[J].水力发电,2018,44(8):82- 86.DIAO Yanfang,DUAN Zhen,ZHANG Rong,et al.Risk analysis of integrated flood control forecasting and dispatching mode for cascade reservoirs [J].Hydropower,2018,44(8):82- 86.
[4] 田忠禄.具有决策支持系统的枢纽橡胶坝安全运行管理自动化系统研究[J].中国水利水电科学研究院学报,2008,6(1):56- 59.TIAN Zhonglu.Research on the safety operation management automation Systemof rubber dam with decision support system [J].Journal of China Research Institute of Water Resources and Hydropower Research,2008,6(1):56- 59.
[5] 张世功,孙廷玺,段伟华,等.沂河梯级橡胶坝调度运用实况对洪水影响分析[J].治淮,2010(5):15- 17.ZHANG Shigong,SUN Tingxi,DUAN Weihua,et al.Impact analysis of actual operation of rubber dam on flood in Yi River [J].Zhihuai,2010(5):15- 17.
[6] MALIWAL S,MURMU M,YADU L K,et al.Multi-reservoir flood control operation by optimization technique:A review[J].International Journal of Engineering Research & Technology,2019,8(8):681- 685.
[7] DAVIS D.US Army Corps of Engineers HEC-5:Simulation of Flood Control and Conservation Systems:User′s Manual.[EB/OL].(1998-10).https://www.iwr.usace.army.mil/Portals/70/docs/iwrreports/hec5user.pdf.
[8] 马黎,冶运涛.梯级水库群联合优化调度算法研究综述[J].人民黄河,2015,37(9):126- 132.MA Li,YE Yuntao.A Review of the combined optimal operation algorithm for cascade reservoirs [J].Yellow River,2015,37(9):126- 132.
[9] 王栋,许圣斌.水库群系统防洪联合调度研究进展[J].水科学进展,2001,12(1):118- 124.WANG Dong,XU Shengbin.Research progress on joint flood control operation of reservoir systems [J].Progress in Water Science,2001,12(1):118- 124.
[10] 周华艳,周建中,何中政,等.基于烟花量粒子群算法的水库群联合优化调度[J].水电能源科学,2018,36(10):84- 87.ZHOU Huayan,ZHOU Jianzhong,HE Zhongzheng,et al.Combined optimal operation of reservoir group based on fireworks quantity particle swarm algorithm [J].Journal of hydropower energy science,2018,36 (10):84- 87.
[11] 许凌杰,董增川,肖敬,等.基于改进遗传算法的水库群防洪优化调度[J].水电能源科学,2018,36(3):59- 62.XU Lingjie,DONG Zengchuan,XIAO Jing,et al.Optimal flood control operation of reservoir group based on improved genetic algorithm [J].Journal of Hydropower Energy Science,2018,36(3):59- 62.
[12] 邹进.基于逐次逼近遗传算法的梯级水库优化调度[J].水利水运工程学报,2012(1):19- 25.ZOU Jin.Cascade reservoir optimal operation based on successive approximation genetic algorithm [J].Journal of Water Resources and Water Transport Engineering,2012(1):19- 25.
[13] 马静.梯级橡胶坝塌坝泄流计算与塌坝方案优化方法研究[D].济南:山东农业大学,2012.MA Jing.Study on discharge calculation and scheme optimization of cascade rubber dam collapse [D].Jinan:Shandong Agricultural University,2012.
[14] 赵伟.基于串并联关系的橡胶坝群调度研究[J].河北水利,2016(1):43.ZHAO Wei.A study on rubber dam group scheduling based on series-parallel relationship [J].Hebei Water Resources,2016(1):43.
[15] 陈亚宁,王志超,仇家琪,等.四棵树河突发性洪水预测预报初探[J].干旱区研究,1990(3):14- 21.CHEN Yaning,WANG Zhichao,QIU Jiaqi,et al.Preliminary study on prediction and prediction of sudden flood in four trees river [J].Arid Area Research,1990(3):14- 21.
[16] 李国英.基于水库群联合调度和人工扰动的黄河调水调沙[J].水利学报,2006,37(12):1439- 1446.LI Guoying.Yellow River water and sediment regulation based on combined reservoir operation and artificial disturbance [J].Journal of Hydraulic Engineering,2006,37(12):1439- 1446.
[17] 邓浩.基于优化算法的梯级闸坝联合调度方法分析[D].太原:太原理工大学,2018.DENG Hao.Analysis of joint dispatching method of cascade gate and dam based on optimization algorithm [D].Taiyuan:Taiyuan University of Technology,2018.
[18] 田月.充水式橡胶坝泄流特性试验研究[D].太原:太原理工大学,2016.TIAN Yue.Experimental study on discharge characteristics of water-filled rubber dam [D].Taiyuan:Taiyuan university of technology,2016.
[19] 徐智廷.沂河梯级橡胶坝汛期调度运用原则探讨[C]//中国水利学会.中国水利学会2010学术年会论文集(上册).郑州:黄河水利出版社,2010:61- 62.XU Zhiting.Discussion on principles of flood season dispatching and application of cascade rubber dam in yihe river [C]//Proceedings of the 2010 Annual Conference of China Water Conservancy Society (Volume I).Zhengzhou:Yellow River Conservancy Press,2010.
[20] ZHANG Qinghua,DIAO Yanfang.Cascade rubber dams fall discharge calculation and analysis[J].Canadian Journal of Civil Engineering,2011,38(8):957- 962.
[21] 张靖,沈欣菲,周升龙,等.橡胶坝塌坝最大泄流量快速估算方法[J].长江科学院院报,2020,37(4):62- 66.ZHANG Jing,SHEN Xinfei,ZHOU Shenglong,et al.Rapid estimation method for maximum discharge of collapse dam of rubber dam [J].Journal of Yangtze River Academy of Sciences,2020,37(4):62- 66.
基本信息:
DOI:10.13928/j.cnki.wrahe.2021.01.014
中图分类号:TV644
引用信息:
[1]赵瑜琪,彭清娥.梯级橡胶坝工程应急调度方案的优化设计[J],2021,52(01):137-145.DOI:10.13928/j.cnki.wrahe.2021.01.014.
基金信息:
水利部项目“库区和坝下游重点河段航道治理措施研究”(ZZ2018013004F);; 国家自然科学基金项目(51539007)