随着可再生能源的比例不断增大,新型电力系统对抽水蓄能这类灵活性资源的需求也逐渐增强。为了促进抽水蓄能电站的投资积极性,市场化的价格机制逐渐健全,但是电价的波动也会使市场化收益具有风险性。在考虑电力市场价格波动的情况下,针对抽水蓄能电站提出了一种基于条件风险价值模型的电能量市场与辅助服务市场联合优化运营策略模型。首先对电力市场价格进行预测,通过抽样、聚合形成典型的电价场景。之后,根据所提的运营策略模型得到不同市场的容量分配结果,并结合抽水蓄能电站的实际情况进行算例分析,验证模型规避风险的有效性。最后,分析了不同的风险偏好以及市场价格对电站收益的影响。结果显示:所提策略在不同电价波动场景中的收益波动量相比传统策略减少了17.2%,且能累计获得76.23万元风险规避效益。风险偏好因子取最小与最大时,预期收益仅相差10.08万元。结果表明:考虑电力市场参与风险的抽水蓄能电站优化运营策略能有效规避市场价格波动风险,能获得更为稳定的预期收益。
Abstract:With the increasing proportion of renewable energy, the demand for flexible resources for the power system is also improving such as pumped storage. In order to improve the investment motivation of pumped storage power station, the market-oriented price mechanism is gradually improved. Considering the fluctuation of market price, a conditional VaR model-based joint optimal operation strategy model of electric energy market and auxiliary service market is proposed herein for pumped storage hydropower station. At first, the electricity market price is predicted, and then the typical scenarios of electricity price are formed through sampling and aggregation. After that, the capacity allocation results for different markets are obtained in accordance with the proposed operation strategy model, while the effectiveness of the model to avoid risk is verified in combination with the case analysis on the actual situation of pumped storage hydropower station. Finally, the influences from different risk preferences and market prices on the profit of the power station are analyzed. The results show that the profit fluctuations in different electricity price fluctuation scenarios obtained from the proposed strategy are deceased by 17.20% if compared with those from the conventional strategy, and then the risk avoidance benefit of 762,300 yuan can be cumulatively obtained. The difference between the expected profits is only 100,800 yuan when the risk preference factors are taken as the minimum and the maximum. The study result shows that the optimal operation strategy with the consideration of electricity market participation risk can effectively avoid the risk of the market price fluctuation and get more stable expected profit.
[1] 张娜,黄和,靳亚东,等.抽水蓄能电站消纳新能源作用分析[J].水力发电,2021,47(6):105-108.ZHANG Na,HUANG He,JIN Yadong,et al.Analysis on the role of pumped-storage power station in new energy consumption[J].Water Power,2021,47(6):105-108.
[2] 国家能源局.抽水蓄能中长期发展规划(2021—2035年)[EB/OL].(2021-09-11)[2022-02-05].http://zfxxgk.nea.gov.cn/1310193456_16318589869941n.pdf.National Energy Administration.Medium and long term development plan of pumped storage (2021-2035)[EB/OL].(2021-09-11)[2022-02-05].http://zfxxgk.nea.gov.cn/1310193456_16318589869941n.pdf.
[3] 肖达强,黎舒婷,舒康安,等.我国抽水蓄能电站的管理体制和运营模式探讨[J].电器与能效管理技术,2016 (14):79-84.XIAO Daqiang,LI Shuting,SHU Kangan,et al.Research on the management systems and operation patterns of pumped-storage power stations in China[J].Electrical & Energy Management Technology,2016 (14):79-84.
[4] 金骆松,刘卫东,纪德良.电力市场背景下抽水蓄能电站交易机制设计[J].科学技术与工程,2021,21(27):11632-11641.JIN Luosong,LIU Weidong,JI Deliang.Design of trading mechanism for pumped storage power stations under the background of power market[J].Science Technology and Engineering,2021,21(27):11632-11641.
[5] ZOU Peng,CHEN Qixin,XIA Qing,et al.Evaluating the contribution of energy storages to support large-scale renewable generation in joint energy and ancillary service markets[J].IEEE Transactions on Sustainable Energy,2016,7(2):808-818.
[6] 姜欣,刘萌,王天梁,等.电网侧储能电站参与现货联合市场的竞价策略[J].电网技术,2021,45(9):3398-3408.JIANG Xin,LIU Meng,WANG Tianliang,et al.Bidding strategy for grid-side energy storage power stations to participate in the spot joint market[J].Power System Technology,2021,45(9):3398-3408.
[7] ALHARBI H,BHATTACHARYA K.Participation of pumped hydro storage in energy and performance-based regulation markets[J].IEEE Transactions on Power Systems,2020,35(6):4307-4323.
[8] BORGHETTI A,D′AMBROSIO C,LODI A,et al.An MILP approach for short-term hydro scheduling and unit commitment with head-dependent reservoir[J].IEEE Transactions on Power Systems,2008,23(3):1115-1124.
[9] HE Y X,LIU P L,ZHOU L,et al.Competitive model of pumped storage power plants participating in electricity spot market:in case of China[J].Renewable Energy,2021,173:164-176.
[10] BASLIS C G,BAKIRTZIS A G.Mid-term stochastic scheduling of a price-maker hydro producer with pumped storage[J].IEEE Transactions on Power Systems,2011,26(4):1856-1865.
[11] ZHAO J,HE Y,FANG Y,et al.Multi-source optimal dispatch considering ancillary service cost of pumped storage power station based on cooperative game[J].Energy Reports,2021,7:173-186.
[12] CHAZARRA M,GARCIA J,PEREZ-DIAZ J I,et al.Stochastic optimization model for the weekly scheduling of a hydropower system in day-ahead and secondary regulation reserve markets[J].Electric Power Systems Research,2016,130:67-77.
[13] KANAKASABAPATHY P,SWARUP K S.Bidding strategy for pumped-storage plant in pool-based electricity market[J].Energy Conversion and Management,2010,51(3):572-579.
[14] CHAZARRA M,PEREZ J I,GARCA J.Optimal joint energy and secondary regulation reserve hourly scheduling of variable speed pumped storage hydropower plants[J].IEEE Transactions on Power Systems,2018,33(1):103-115.
[15] TIAN M W,YAN S R,TIAN X X,et al.Risk and profit-based bidding and offering strategies for pumped hydro storage in the energy market[J].Journal of Cleaner Production,2020,256:120715.
[16] ZHOU L,LIU P,LIU S,et al.Bidding strategy of pumped storage power station in spot market considering different optimization periods[J].E3S Web of Conferences,2020,194(4):01009.
[17] 周任军,姚龙华,童小娇,等.采用条件风险方法的含风电系统安全经济调度[J].中国电机工程学报,2012,32(1):56-63.ZHOU Renjun,YAO Longhua,TONG Xiaojiao,et al.Security economic dispatch in wind power integrated systems using a conditional risk method[J].Proceedings of the CSEE,2012,32(1):56-63.
[18] 周浩,康建伟,陈建华,等.蒙特卡罗方法在电力市场短期金融风险评估中的应用[J].中国电机工程学报,2004,24(12):78-81.ZHOU Hao,KANG Jianwei,CHEN Jianhua,et al.Evaluating short-term financial risk in the electricity market by applying Monte-Carlo method[J].Proceedings of the CSEE,2004,24(12):78-81.
[19] 于旭光,李刚,李亚鹏,等.计及电价风险和差价合同的梯级水电站日前市场竞价模型[J].电力系统自动化,2021:1-11.YU Xuguang,LI Gang,LI Yapeng,et al.Day-ahead market bidding model for cascade hydropower station considering price risk and contract for price difference[J].Automation of Electric Power Systems,2021:1-11.
[20] DABBAGHJAMANESH M,MEHRAEEN S,KAVOUSIFARD A,et al.Effective scheduling operation of coordinated and uncoordinated wind-hydro and pumped-storage in generation units with modified JAYA algorithm.in 2017 IEEE Industry Applications Society Annual Meeting.2017.
[21] 杨宏基,周明,张茗洋,等.电力市场下抽水蓄能电站运营策略及效益分析[J].华北电力大学学报(自然科学版),2021,48(6):71-80.YANG Hongji,ZHOU Ming,ZHANG Mingyang,et al.Operational mechanism and cost-benefit analysis of pumped storage plant in power market environment[J].Journal of North China Electric Power University (Natural Science Edition),2021,48(6):71-80.
[22] 关玉衡,张经纬,张轩,等.美国电力市场环境下抽水蓄能调度模式分析及启示[J].电力系统自动化,2021,45(13):1-11.GUAN Yuheng,ZHANG Jingwei,ZHANG Xu,et al.Analysis and enlightenment of pumped storage dispatch modes under American electricity market[J].Automation of Electric Power Systems,2021,45(13):1-11.
[23] 杨佳澄,汪荣华,杜英,等.基于CVaR的风电机组日前申报出力优化模型研究[J].智慧电力,2021,49(5):21-27.YANG Jiacheng,WANG Ronghua,DU Ying,et al.Decision-making optimization model of day-ahead bidding for wind turbine based on CVaR[J].Smater Power,2021,49(5):21-27.
[24] 刘顺桂,艾欣,王坤宇,等.考虑电动汽车参与的电力系统发电与备用协同风险决策模型[J].华北电力大学学报(自然科学版),2019,46(4):54-62.LIU Shungui,AI Xin,WANG Kunyu,et al.Collaborative risk decision-making model for electric power generation and reserve determining considering participation of electric vehicles[J].Journal of North China Electric Power University (Natural Science Edition),2019,46(4):54-62.
[25] ROCKFALLAR R T,URYASEV S.Conditional value-at-risk for general loss distributions[J].Journal of Banking & Finance,2002,26(7):1443-1471.
[26] ROCKFALLAR R T,URYASEV S.Optimization of conditional value-at-risk[J].Journal of Risk,2000,2:21-42.
[27] 周丽.抽水蓄能电站主辅市场容量分配模型及竞价策略研究[D].北京:华北电力大学(北京),2021.ZHOU Li.Pumped storage station′s capacity allocation model and bidding strategies in electricity energy market ancillary service market[D].Beijing:North China Electricity Power University (Beijing),2021.
[28] 杨佳澄,翟晓鹤,谭忠富,等.基于相对鲁棒CVaR的高不确定性机组日前竞价申报优化[J].电网技术,2021,45(11):4366-4376.YANG Jiacheng,ZHAI Xiaohe,TAN Zhongfu,et al.Day-ahead bidding optimization for high-uncertainty units based on relatively robust conditional value at risk[J].Power System Technology,2021,45(11):4366-4376.
基本信息:
DOI:10.13928/j.cnki.wrahe.2022.07.009
中图分类号:TV743;F426.61;F426.91
引用信息:
[1]刘飞,车琰瑛,田旭,等.考虑电力市场参与风险的抽水蓄能电站优化运营策略[J],2022,53(07):94-104.DOI:10.13928/j.cnki.wrahe.2022.07.009.
基金信息:
浙江省公益技术研究计划(LGJ21E070001);; 国家自然科学基金项目(52007164)