乌东德金坪子滑坡地表变形特征与地下排水效果
基金项目(Foundation): 国家重点研发计划课题(2018YFC1508603,2018YFC1508505);; 水工岩石力学教育部重点实验室(武汉大学)开放基金(RMHSE1906)
邮箱(Email):
DOI: 10.13928/j.cnki.wrahe.2021.01.015
摘要:

为了保障乌东德大坝的安全运行,有必要研究近坝滑坡体金坪子滑坡的地表变形特性并分析其地下排水效果。为此,基于表面变形观测成果和地质资料,分析了滑坡体表面变形的增量、空间分布和时变特性。结果表明:金坪子滑坡体Ⅱ区变形最大且处于蠕滑变形状态,Ⅰ区次之,其他区变形较小,滑坡体具有牵引式变形特点;Ⅱ区前缘变形大后缘变形小,年同期增量随测点高程的增大而逐渐减小,前缘变形方向指向临空面和下游侧。基于地下水位孔观测成果,分析了地下水位的状态、变化过程和规律,阐明了排水措施对地下水位和滑坡体稳定性的影响。同时,由观测成果可知,受排水洞排水的影响,金坪子Ⅱ区地下水位下降了3.0~12.3 m,滑坡体年同期表面位移增量减小,滑坡体阻滑力提升,排水洞具有排水和增强滑坡体稳定性的作用。

Abstract:

In order to guarantee the safe operation of the dam for Wudongde Hydropower Station, it is necessary to study the characteristics of the surface deformation of the near-dam landslide-Jinpingzi Landslide and analyze the underground drainage effect of it. Therefore, the increment of the surface deformation, the spatial distribution and the time-varying characteristics of the surface deformation of the landslide body are analyzed in accordance with the observed results of the surface deformation and the relevant geological data. The results show that the deformation within the zone Ⅱ of Jinpingzi Landslide is the largest under a creeping deformation status, which is followed with that within the zone Ⅰ, while the deformations within the other zones are smaller. Moreover, the landslide has the characteristics of tractive deformation. The deformation is large at the front edge and small at the back edge, of which the annual increment in the same period is gradually decreased along with the increase of the elevation of the measuring point and the direction of the front edge deformation points to the free face and the downstream side. Based on the results from the observation holes for ground water level, the status, changing process and law of the groundwater level are analyzed, and then the effects of the drainage measures on the groundwater level and the stability of the landslide are clarified as well. Under the effect of the drainage from drain-tunnel, the ground water level within the zone Ⅱ of Jinpingzi Landslide is lowered by 3.0~12.3 m along with the decrease of the annual increment of the deformation in the same period and the enhancement of the sliding resistance of the landslide body, thus the drain-tunnel has the functions of drainage and enhancing the stability of the landslide body.

参考文献

[1]刘传正,刘艳辉,温铭生,等.长江三峡库区地质灾害成因与评价研究[M].北京:地质出版社,2007.LIU Chuangzheng,LIU Yanhui,WEN Mingsheng,et al.Study on the causes and evaluation of geological disasters in the Three Gorges Reservoir area of the Yangtze River[M].Beijing:Dizhi Press,2007.

[2]王志旺,杨健,张保军,等.水库库岸滑坡稳定性研究[J].岩土力学,2004,25(11):1837-1840.WANG Zhiwang,YANG Jian,ZHANG Baojun,et al.Study of stability of landside of reservoir area[J].Rock and Soi I Mechanics,2004,25(11):1837-1840.

[3]郑鸿超,石振明,彭铭,等.崩滑碎屑体堵江成坝研究综述与展望[J].工程科学与技术,2020,52(2):1-10.ZHENG Hongchao,SHI Zhenming,PENG Ming,et al.Review and prospect of the formation mechanism of landslide caused by landslide and avalanche debris[J].Advanced Engineering Sciences,2020,52(2):1-10.

[4]郑栋,段国学,彭绍才,等.乌东德水电站工程第一阶段蓄水验收安全监测资料分析报告[R].武汉:长江勘测规划设计研究有限责任公司,2019.ZHENG Dong,DUAN Guoxue,PENG Shaocai,et al.Analysis report on the safety monitoring data of the first stage water stage of Wudongde hydropower project[R].Wuhan:Changjiang Survey,Planning,Design and Research Co.,Ltd.,2019.

[5]黄小艳,丁刚,施华堂,等.金沙江乌东德水电站蓄水验收(第一阶段)设计报告:金坪子专题报告[R].武汉:长江勘测规划设计研究有限责任公司,2019.HUANG Xiaoyan,DING Gang,SHI Huatang,et al.Jinshajiang Wudongde hydropower station water storage acceptance (first stage) design report:Jinpingzi special report[R].Wuhan:Changjiang Survey,Planning,Design and Research Co.,Ltd.,2019.

[6]王团乐,刘冲平,郝文忠,等.乌东德水电站金坪子巨型滑坡地质研究[J].人民长江.2014,45(20):54-58.WANG Tuanle,LIU Chongping,HAO Wenzhong,et al.Geological study of Jinpingzi giant landslide at Wudongde hydropower station[J].Yangtze River,2014,45(20):54-58.

[7]蒋树,王义锋,唐川,等.金沙江下游金坪子Ⅱ区低速滑坡活动机理初探[J].工程地质学报,2017,25(6):1547-1556.JIANG Shu,WANG Yifeng,TANG Chuan,et al.Preliminary study of the creep mechanism of Jinpingzi zoneⅡslow moving landslide in lower reaches of Jinsha river[J].Journal of Engineering Geology,2017,25(6):1547-1556.

[8]丁刚,王汉辉,黄小艳,等.乌东德水电站工程金坪子滑坡防护方案及效果分析[J].中国水利,2017(S1):114-117.DING Gang,WANG Hanhui,HUANG Xiaoyang,et al.Protection scheme and performance analysis of Jinpingzi landslide in Wudongde hydropower project[J].China Water Resources,2017(S1):114-117.

[9]MARC O,ANDRES,MALET J P,et al.Towards a global database of rainfall-induced landslide inventories:first insights from past and new events[J].Earth Surface Dynamics,2018(6):903-922.

[10]PARK E,PARKER J C.A simple model for water table fluctuations in response to precipitation[J].Journal of Hydrology,2008,356(3-4):344-349.

[11]HONG Y M.Feasibility of using artificial neural networks to forecast groundwater levels in real time[J].Landslides,2017,14:1815-1826.

[12]KRKA CM,SPOLJARI C'D,BERNAT S,et al.Method for prediction of landslide movements based on random forests[J].Landslides,2017,14:947-960.

[13]刘祖强,等.工程变形监测分析预报的理论与实践[M].北京:中国水利水电出版社,2008.LIU Zuqiang,et al.Theory and Practice of Engineering Deformation Monitoring Analysis and Forecast[M].Beijing:China Water&Power Press,2008.

[14]BIANCO B,BRUCE D A.Large landslide stabilization by deep drainage wells[C]//The Institution of Civil Engineers.Proceedings of the international conference on slope stability organized by the Institution of Civil Engineers.London:Thomas Telford,1991:341-348.

[15]EBERHARDT E,BONZANIGO L,LOEW S.Long-term investigation of a deep-seated creeping landslide in crystalline rock.Part II.Mitigation measures and numerical modelling of deep drainage at Campo Vallemaggia[J].Canadian Geotechnical Journal,2007,44 (10):1181-1199.

[16]WANG Z L,SHANG Y Q,SUN H Y.Optimal location and effect judgment on drainage tunnels for landslide prevention[J].Journal of Central South University,2013,20:2041-2053.

[17]SUN H Y,WONG L N Y,SHANG Y Q,et al.Evaluation of drainage tunnel effectiveness in landslide control[J].Landslides,2010,7:445-454.

[18]MATTI L,TACHER L,COMMEND S.Modelling the behaviour of a large landslide with respect to hydrogeological and geomechanical parameter heterogeneity[J].Landslides,2005,2:3-14.

[19]YAN L,XU W,WANG H,et al.Drainage controls on the Donglingxing landslide (China) induced by rainfall and fluctuation in reservoir water levels[J].Landslides,2019,16:1-11.

[20]WEI Z L,LYU Q,SUN H Y,et al.Estimating the rainfall threshold of a deep-seated landslide by integrating models for predicting the groundwater level and stability analysis of the slope[J].Engineering Geology,2019,253:14-20.

[21]WEI Z L,SHANG Y Q,SUN H Y,et al.The effectiveness of a drainage tunnel in increasing the rainfall threshold of a deep-seated landslide[J].Landslides,2019,16:1731-1744.

[22]WEI Z L,SUN H Y,XU H D,et al.The effects of rainfall regimes and rainfall characteristics on peak discharge in a small debris flowprone catchment[J].Journal of Mountain Science,2019,16 (7):1646-1660.

[23]RAHARDJO H,HRITZUK K J,LEONG E C,et al.Effectiveness of horizontal drains for slope stability[J].Engineering Geology,2003,69(3-4):295-308.

基本信息:

DOI:10.13928/j.cnki.wrahe.2021.01.015

中图分类号:P642.22

引用信息:

[1]彭绍才,郑栋,段国学,等.乌东德金坪子滑坡地表变形特征与地下排水效果[J],2021,52(01):146-158.DOI:10.13928/j.cnki.wrahe.2021.01.015.

基金信息:

国家重点研发计划课题(2018YFC1508603,2018YFC1508505);; 水工岩石力学教育部重点实验室(武汉大学)开放基金(RMHSE1906)

引用

GB/T 7714-2015 格式引文
MLA格式引文
APA格式引文
检 索 高级检索