| 201 | 4 | 86 |
| 下载次数 | 被引频次 | 阅读次数 |
我国有大量水电站所在河流泥沙含量高,在夏季丰水期需降低水库水位作排沙运行,导致电站在丰、枯水期运行时水头变幅很大。"超常规水头变幅电站"即是指最高水头与额定水头之比超过1.4的水电站。为满足灌溉需要,部分超常规水头变幅电站水库各旬放水量极不均匀,又会导致过机流量变化也很悬殊,常规的水轮机选型原则无法满足类似电站的选型需求。通过分析新疆某超常规水头变幅电站的运行参数,划定了高、低水头段,使水轮机组分别配置相应的水轮机转轮,以实现在不同水力参数下运行时,水轮机均处于较高效率运行范围,同时提升了水轮机的运行稳定性。
Abstract:There are a large number of hydropower stations in China that have high sediment content in the rivers, and they need to operate at low water levels during the summer high water period, which leads to large head changes during the high and low water periods. The "transnormal head variable amplitude hydropower station" in here refers to a hydropower station with a ratio of the highest water head to the rated water head exceeding 1.4. For some transnormal hydraulic head variable amplitude power stations, in order to meet the needs of irrigation, the water discharge of the power station reservoirs is extremely uneven every ten days, and it will also cause the flow rate to vary greatly. If the conventional hydraulic turbine selection principle is adopted, the selection requirements of similar power stations cannot be met. This paper analyzes the operating parameters of a hydropower station in Xinjiang, delineates the high and low head sections, and configures the corresponding turbine runners respectively to realize that the turbines are in a higher efficiency operating range when operating under different parameters, and at the same time, it can also improve operational stability of the turbine.
[1] 秦赫.高水头混流式水轮机的结构与运行特征探讨[J].科技创新与应用,2015(29):152.
[2] 刘赛艳,解阳阳,黄强,等.流域水文年及丰枯水期划分方法[J].水文,2017,37(5):49-53.
[3] 彭忠年,陈锐,田娅娟,等.红山嘴三级水电站枯水期运行问题的解决方案[C]//中国水力发电工程学会水力机械专业委员会.第十七次中国水电设备学术讨论会.北京:中国水利水电出版社,2009:507-510.
[4] 易艳林,陆力.水轮机泥沙磨损研究进展[J].水利水电技术,2014,45(4):160-163.
[5] 郭鹏程,孙龙刚,罗兴锜.混流式水轮机叶道涡流动特性研究[J].农业工程学报,2019,35(20):43-51.
[6] 吴玉林,吴晓晶,刘树红.水轮机内部涡流与尾水管压力脉动相关性分析[J].水力发电学报,2007,26(5):122-127.
[7] 刘胜柱,罗兴錡,梁武科.水头变幅大的混流式水轮机水力设计[J].水力发电学报,2003,22(4):105-111.
[8] 何国任,周思妤.水头变幅大的水电站采用双速发电机提高水轮机效率的研究[C]//中国动力工程学会水轮机专业委员会.第十九次中国水电设备学术讨论会.哈尔滨:黑龙江科学技术出版社,2013:356-361.
[9] 中华人民共和国国家发展和改革委员会.水力发电厂机电设计规范:DL/T 5186—2004[S].北京:中华人民共和国国家发展和改革委员会,2004.
[10] 薛鹏,王鑫,田娅娟,等.中小水电站增效扩容改造的主要问题及解决方案[J].中国农村水利水电,2014(2):133-136.
[11] 董宏成,杨敦敏.二滩水轮机枯水期降低水库水位运行研究[J].水力发电,2009,35(7):64-69.
[12] 陈锐,王鑫,田娅娟,等.优化叶片数的枯水期转轮及配备该转轮的混流式水轮机:201410494888.9[P].2015-09-16.
基本信息:
DOI:10.13928/j.cnki.wrahe.2021.S1.046
中图分类号:TV734.1
引用信息:
[1]王鑫,薛鹏,彭忠年,等.超常规水头变幅电站的水轮机选型研究[J].水利水电技术(中英文),2021,52(S1):248-251.DOI:10.13928/j.cnki.wrahe.2021.S1.046.
基金信息:
中国水利水电科学研究院科技成果转化基金专项(HTJD1003B012017); 中水科技公司技术研发项目(ZB-10-ZY-03)
2021-03-20
2021-03-20