关键链项目管理(CCPM)方法应用边界条件研究
基金项目(Foundation): 基于公共项目利益相关者理论(PPST)的天津站交通枢纽工程项目整体策划研究(06ZIZLZT02100)
邮箱(Email):
DOI:
发布时间: 2007-09-20
出版时间: 2007-09-20
移动端阅读
摘要:

关键链项目管理(CCPM)方法是约束理论(TOC)在项目管理领域的具体应用,文中在对CCPM方法的基本原理概述的基础上,深入分析了CCPM方法存在的问题,探讨了CCPM方法应用的边界条件,并对有关问题指出了进一步研究的方向,以期促进CCPM方法在提高项目管理绩效方面的应用与研究。

Abstract:

Critical Chain Project Management(CCPM) method is the application of the Theory of Constraints(TOC)in project management area.Based on the simple overview of the method,the problems inherent in the assumption behind CCPM,the determination of the critical chain,the time buffer and its application in multi-project environment of CCPM have been thoroughly discussed.Some suggestions for the application boundary conditions of the method have been referred to and relative study directions have been pointed out in order to promote its application in improving project management performances.

参考文献

[1]Tavi Raz,Robert Barnes,Dov Dvir.ACritical Look at Critical ChainProject Management[J].Project Management Journal,2003,(12):24-31.

[2]艾利,高德拉特(Eliyahu Goldratt).关键链[M].罗嘉颖译.北京:电子工业出版社,2006.75-76.

[3]Larry P Leach.Critical Chain Project Management Improves ProjectPerformance[J].Project Management Journal,1999,(6):39-51.

[4]欧阳斌.工程网络计划进度风险分析及关键链进度计划法研究[D].天津大学硕士学位论文,2003.

[5]Hill Thomas Allen.Experts’estimate of task durations in software de-velopment projects[J].International Journal of Project Management,2000,12(1):13-24.

[6]Genaro J Gutierrez,Panagiotis Kouvelis.Parkinson’s Law and ItsImplications For Project Management[J].Management Science,1991,37(8):990-1001.

[7]赵道致,廖华,刘一骝.关键链法:一种新的项目进度计划方法[J].天津理工大学学报,2005,21(2):8-12.

[8]Willy Herroelen,et al.Critical Chain Project Scheduling:Do Not O-versimplify[J].Project Management Journal,2002,(12):48-60.

[9]单汨源,龙颖.一种关键链缓冲机制改进方法及其应用研究[J].项目管理技术,2006,(9):32-35.

[10]蔡晨,万伟.基于PERT/CPM的关键链管理[J].中国管理科学,2003,(6):35-39.

[11]Zinovy D Radovilsky.A Quantitative Approach to Estimate the Sizeof Time Buffer in the Theory of Constraints[J].International Journalof Production Economics,1998,55(2):113-1.

[12]刘士新,宋健海,唐家福.关键链——一种项目计划与调度新方法[J].控制与决策,2003,(18):513-516.

[13]刘士新,等.基于关键链的资源受限项目调度新方法[J].自动化学报,2006,(32):60-66.

基本信息:

中图分类号:TV512

引用信息:

[1]陈伟珂,韩志国.关键链项目管理(CCPM)方法应用边界条件研究[J].水利水电技术,2007,No.407(09):71-74.

基金信息:

基于公共项目利益相关者理论(PPST)的天津站交通枢纽工程项目整体策划研究(06ZIZLZT02100)

发布时间:

2007-09-20

出版时间:

2007-09-20

引用

GB/T 7714-2015 格式引文
MLA格式引文
APA格式引文
检 索 高级检索